With India’s infrastructure sector driving higher cement demand, the country is now the
second-largest global producer of quality cement. In response, industry participation is
expanding. The Planning Commission of India’s ‘Working Group on Cement Industry’ aims
to improve sector efficiency. At Sumit Engineering, we specialize in modernization,
maintenance, and technological upgrades. With our licenses for the erection of Boilers and
Waste Heat Recovery Systems (WHRS), we are equipped to help you optimize operations
and capitalize on growth opportunities.
Sr. No. | Cement Plant | Job Details | Time period |
1 | Zuari Cement Ltd., Yerraguntla, AP. | Installed Fly ash Dryer and Baghouse | Sep 2009 – May 2010 |
2 | JSW Cement Ltd., Nandyal. | Fabrication and Erection of Preheater | April 2010 – Feb 2011 |
3 | Zuari Cement Ltd., Attipattu. | Fabrication and Erection of Grinding Unit (Cement Mill, Wagon tippler, Clinker Silo, Fly ash, Packing Plant, etc.) 3600TPD | Sep 2010 – August 2011 |
4 | Zuari Cement Ltd., Yerraguntla, AP. | Installed Wagon loading system, Packing Plant, Coal mill shed, ESP, etc. | Jan 2011 – Dec 2011 |
5 | Bagalkot Cement, Bagalkot, KA. | Fabrication and Erection of Crusher, Baghouse, Preheater, fly ash silo, etc. | July 2011 – Sep 2012 |
6 | Ultratech Cement Ltd., Birla White, Katni, MP | Mechanical Fabrication and Erection Job | 2014 |
7 | Zuari Cement, Solapur, MH | Fabrication and Erection of Complete project of Grinding unit of 3600TPD. | Feb 2014 – Jan 2015 |
8 | Zuari Cement, Cochin, Kerala | Fabrication and Erection of Complete project of Grinding unit. | May 2015 – Feb 2016 |
10 | Mangalam Cement, Morak, Rajasthan | Grinding Unit | May 2014 – July 2014 |
11 | Maruti Cement Ltd., Siraha, Nepal. | Complete Plant project ( Fabrication and Erection of Crusher, Raw mill, Baghouse, Preheater, Kiln, ESP, Clinker Silo, Cement Mill, Packing Plant, all equipments, etc.) | March 2013 – Jan 2015 |
12 | Subhashree Agni Cement, Nepal. | Complete Plant project except crusher ( Fabrication and Erection of Raw mill, Baghouse, Preheater, Kiln, ESP, Clinker Silo, Cement Mill, Packing Plant, all equipments, etc.) | 2015-2016 |
13 | Ultratech Cement Ltd., Vikram Cement Works, Neemuch, MP. | Job of Conversing Cement Mill Line III ESP to Baghouse. | 2016 |
14 | Nuvaco Vistas, Jojobera, Jharkhand. | Project of installing clinker slag roller press circuit and Erection of Bucket elevator and belt Conveyor System. | 2018 |
15 | EOM Engineering, Sonadih, CG. | Expansion of Packing Plant | 2018 |
16 | Subhashree Agni Cement, Nepal. | Complete Project of Cement Grinding Unit. | 2018 |
17 | Ultratech Cement Ltd, Shambhupura, Rajasthan | Fabrication and Erection of Belt Conveyor and Calciner Modification work. | 2019 |
18 | Ultratech Cement, Kotputli, Rajasthan | Raw mill cyclone modification and Increased the height of Cyclone. | 2018 |
19 | J K Cement, Mangrol, Rajasthan. | Fabrication of Casing, Gas ducts and hopper of AQC Boiler and PH Boilers. | 2019 |
20 | ACC Gagal, Barmana, HP under Sinoma LNVT | Fabrication and Erection of Fly ash Dryer, Conveyor, etc. | 2019-20 |
21 | Ambuja Cement, Marwar, Mundwa, Rajasthan under Sinoma LNVT | Fabrication, Copper slag blasting & Painting of 1600 | 2019-2020 |
22 | Sagar Cement Group Satguru Cement Plant, Jeerabad, Manawar, MP | Fabrication and Erection of Raw mill, Baghouse, Preheater, Kiln, ESP, Clinker Silo, Cement Mill, all equipments, etc. and Erection of WHRS boilers. Fabrication = 6600 and Erection = 14500 | 2020-2021 |
23 | Ultratech Cement Limited, Dhar, Madhya Pradesh. Line II: Post Clinkerization Project. | Fabrication and Erection of Post Clinkersation unit of UTCL Dhar Cement works. Fabrication = 4100 and Erection = 7900 | 2021-2022 |
24 | ACC Cement, Gagal, Himachal Pradesh. | Erection of Clinker Silo (Clinker Tank) Erection = 575 | 2021 |
25 | JK Cement Group Jaykaycem (Central) Ltd., Panna, Madhya Pradesh | Fabrication and Erection of Crusher. Fabrication = 2100 Erection = 4500MT | 2022 |
26 | Ultratech Neem Ka thana Cement Works, Sirohi, Neem Ka Thana, Rajasthan | Fabrication and Erection of Post Clinkersation unit of UTCL Neem ka thana Cement works. | 2022 |
27 | Ultratech Cement Limited, Rajpura Cement Works, Punjab | Fabrication and Erection of Complete Grinding unit of UTCL Rajpura Cement works. Fabrication = 4400 and Erection = 8900 | 2023-2024 |
28 | Ultratech Cement Limited, Kotputli Cement Works, Rajasthan | Fabrication and Erection of Post Clinkerisation of UTCL Kotpulti Cement works. Fabrication = 3400 and Erection = 7600 | 2023-2024 |
29 | Shree Cement Limited, Etah, Agra, Uttar Pradesh | Completed fabrication, erection, installation, and commissioning of Shree Cement Etah Grinding Unit within benchmark time, earning appreciation from the Shree Cement Management Team. | 2024-2025 |
30 | Ultratech Cement Limited, Dalla Cement Works, Uttar Pradesh | Complete Pyro Upgradation Shutdown Project (involving Fabrication, Dismantling & Erection of preheater, coal mill, etc) was successfully executed within just a span of 40 days. Setting up the benchmark in cement industry. | 2025 |